CDCR Seeking Maintenance and Repair Services for SCADA System at California State Prison, Solano Water Treatment Plant

Quotes Needed for Water Treatment Technology Services by CDCR

The California Department of Corrections and Rehabilitation (CDCR) is currently seeking maintenance, calibration, inspection, and repair services for the Supervisory Control and Data Acquisition (SCADA) system at the California State Prison, Solano water treatment plant. This agreement has a performance period from July 1, 2024, to June 30, 2027, with an initial agreement not exceeding $180,000 as stated in the RFQ documents.

Interested vendors must participate in a mandatory walk-through of the facility before submitting a quote package. Walk-throughs can be scheduled through Martha Gallegos and Billy Ray Butler before April 5. The deadline to submit a bid package is 2 p.m. on May 7. Ashley Koewler is the point of contact for this RFQ.

If deemed in the best interest of the CDCR, the resulting agreement may be amended to extend the term and/or increase funding consistent with the original Scope of Services according to the documents. To be considered for this opportunity, vendors must complete the walk-through and submit their bid packages on time.

The California Department of Corrections and Rehabilitation (CDCR) is currently seeking maintenance, calibration, inspection, and repair services for the Supervisory Control and Data Acquisition (SCADA) system at the California State Prison, Solano water treatment plant. This agreement has a performance period from July 1, 2024, to June 30, 2027, with an initial agreement not exceeding…

Leave a Reply